It still lacks a roof and some other details

Eine Uebersicht auf die Raumaufteilung im OG slider
The Media Center on August 7, 2015

Dear Diospi Suyana friends and readers of the building report, currently, we have to make do with less builders. One has resigned, and another broke his foot playing soccer. Nevertheless, almost all the walls that must stand before concreting the roof have been completed.

The space above the stairs is already cased and the ground floor is already stripped. The concrete floor looks very good from the bottom. We must work quickly, because I want to have the ceiling concreted in two weeks—before I give my vows before God in Lima to my dream wife Angela. Perhaps you remember the building report on the ground floor tour. (If not, it can be found here: https://www.diospi-suyana.de/bauingenieur-johannes-bahr-fuehrt-sie-durch-das-erdgeschoss-3/?lang=en . Upstairs, the floor plan is similar. There is a spacious conference room, as well as radio studios and offices in the server room and the entrance area. There is also a kitchen, which will serve not only the staff, but also for food preparation for meetings in the conference room or special recordings in the TV studio.

Have a beautiful and blessed week, Johannes

Die ersten Ausschalarbeiten slider
This will be the future launch.

The last stones are ready for cutting.

Einer der letzten Fensterbalken wird bewehrt slider
One of the last window bars is reinforced.
Hier wird später die ausziehbare Dachbodenleiter eingesetzt slider
Here the extendable attic ladder will be fastened.