August 2005 to June 2024 – Udo Klemenz wrote construction reports for almost 19 years

We have no words to express our gratitude

Hello dear Diospi friends, this is my last construction report today. I return to Germany on Saturday. During my 5-week stay, a lot of progress was made down in Lucmos at the leisure center.

During this time, I also carried out the technical processing for the planned extension of the residence in the hospital grounds. The execution of the work has not yet been scheduled, but I will no longer be available for on-site construction supervision.

In the leisure center, the upper floor slab of the first section was stripped panel by panel, the formwork material cleaned and immediately reinstalled for the second section of the slab. This worked wonderfully and the iron benders were able to start laying the reinforcement. Concreting of the second slab section should be possible by the middle of next week at the latest.

The third flight of stairs with the associated intermediate landing was formed, reinforced and concreted.

After stripping the upper floor slab, the bricklayers immediately started laying the partition walls on the first floor and achieved a good performance. Last greetings from Curahuasi, Udo

Editor: If you want to understand the historical contribution of Udo and Barbara Klemenz, you have to read the books about Diospi Suyana. Her voluntary work spanned two decades. They served God and people in a way that completely convinced us all. The many areas of her active work in Peru included: Hospital, dental/eye clinic, children’s clubhouse, school, expansion of the hospital, extension of the media center, two additional operating theaters, building 8 for the school, orthopedics workshop, sanitary facilities for the festivals and the recreation center. – And it all began on Wednesday, February 16, 2005 in the kitchen of their Niederbiel home with a prayer: “God, do you have a mission for us?” – Five minutes later, an unknown doctor from Wiesbaden, who had heard the Klemenz’ names for the first time two minutes earlier, called. The rest is history. /KDJ

The first section of the upper floor slab is being stripped.
The second section is shuttered.
The-shell-elements-are-layed-on-the-substructure
The formwork elements are laid on the substructure.
The slab formwork has been completed. On the right you can see the stairwell.
The flight of stairs and the platform are reinforced.
The staircase and landing are concreted.
Use the chalk line to mark the partition walls.
The brickwork for the partition walls is progressing rapidly.
Ten quad bikes and over 20 motorcycles parked by mainly local employees in the entrance area of the hospital